The "Pine Valley" model

Gas Fireplace
Heat-N-Glo model 750 TR direct vent, adjustable blower fan, remote control operator, polished brass venting louvers and "Lexington" style wood mantle with fluted pilasters and dentil molding.
$5,000
Central Air Conditioning
One 3.5 ton exterior condensing unit.
$4,000
Finish Room - Second Floor

Finish  room on the second floor to same specifications as rest of house.

$20,000
Open Rail System - Stairway (one side)

Open rail system with oak handrail & newell post and pine turned balusters.

$3,000
Oak Hardwood Stairs Treads

Treads to have same finish as oak floors, pine risers to be painted.

$3,500
Bullnose Starting Step & Volute (one side)

Bullnose starting step with oak tread and round over-the-top oak handrail.

$2,000
Central Vacuum

Nutone CV353 with 30' hose and accessories, two outlets per floor.

$2,500
Stair System from Deck to Grade - Full Walkout

White vinyl railings with composite stair treads to match deck.

$3,000
Stair System from Deck to Grade - Half Walkout

White vinyl railings with composite stair treads to match deck.

$2,500
Alarm System
“GE NX Series” with two first floor control pad, one basement motion detector, two first floor motion detectors and 4 door contacts: front, slider, garage and basement.
$2,000
Kitchen Island or Peninsula

Two 36” base cabinets with 1’ countertop overhang (standard cabinet selections).

$2,000
Colonial Trim Package –Foyer and Hallway

3-5/8” crown molding, “Governor Francis” chair rail, and wainscoting (panel squares in 1” base molding).

$1,750
Colonial Trim Package – Kitchen & Great Room

3-5/8” crown molding, “Governor Francis” chair rail, and wainscoting (panel squares in 1” base molding).  Add $500 for the Den Bumpout.

$2,500
Kitchen Under-Cabinet Lighting or Landing Accent $1,500
Move Stairway
Relocate stairway next to garage wall to widen living room.
$1,250
Rough Plumb for Future Basement Bathroom

Price is for under slab work only in houses with sewer line located underneath slab.  Add $5,000 to finish a full bathroom including toilet, vanity with sink, tub/shower enclosure and ceramic tile flooring.

$2,000
Garage Side Door
One "9-Lite" steel insulated door.
$1,000

Remove Lally Column

Price to remove one (1) lally column in basement and replace beam with “Paralam” engineered beam.

$1,500

Triple Transom Window

Three fixed glass panels mulled together approx. 20”x102.”

$1,250

Shower Enclosure

Door with side-light, chrome frame, and obscure glass.

$950

"A-Coil"
Installed at furnace for future air conditioning.
$750

Double Hung Window

Standard size window located anywhere in the house.

$500

Front Entry Storm/Screen Door

EMCO interchangeable full view aluminum door in white with brass handles and door sweep.

$500

Air Cleaner or Humidifier
Price per unit.
$500

Fan Junction Box

Prewiring including on/off switch.  Builder will install Buyer supplied fan.

$250

220 Volt Electric Outlet

Preconstruction only.  Replaces gas line for stove or dryer.

$200
Recessed Light
Same as Building Specifications - slope or flat ceiling
$200
Ice Maker Water Line $150
RG6 Catv Outlet or CAT 5 Telephone Outlet
Pre-wiring only, price per location.
$100
Increase Deck Size (Price Per Square Foot)
Same as Building Specifications - upgrade charge per square foot.
$65.00
Finished Basement (Price Per Square Foot)
Please consult the Builder for details.
$50.00
Flooring Upgrades - Hardwood, Carpet & Tile
Please consult the Builder for details.

Cabinet & Countertop Upgrades
Please consult the Builder for details.


Options and prices are subject to change without notice – Oct. 1, 2010